WIND Β· OPERATIONAL

Auchrobert

Auchrobert is a 38.8 MW onshore wind farm in Scotland, operated by Falck Renewables SpA. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningDec 2012 (completed)
  2. ConsentedApr 2014 (completed)
  3. ConstructionApr 2015 (completed)
  4. OperatingMar 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
38.8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Falck Renewables SpA
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Coordinates
55.6240, -3.9842

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Auchrobert compares

132nd of 488largest wind farms in the UK register
76th of 199in Scotland
0.13%of listed UK wind farms capacity
β‰ˆ 88 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 38.8 MW station would generate roughly 88 GWh of electricity in a year, similar to the annual use of about 32,700 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Falck Renewables SpA

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Auchrobert Wind Farm
Developer / operator
Falck Renewables
Planning authority
South Lanarkshire
Planning reference
CL/12/0556
Application submitted
14 December 2012
Permission granted
9 April 2014
Construction started
1 April 2015
Began operating
20 March 2017
Capacity in planning record
36 MW
Address
South Lanarkshire ML11 0HP, Strathclyde
REPD reference
4337

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.