Lochhead
Lochhead is a 6 MW onshore wind farm in Scotland, operated by Temporis Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 6 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Temporis Capital
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- ML9 3PP
- Coordinates
- 55.6959, -3.9823
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Lochhead compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6 MW station would generate roughly 14 GWh of electricity in a year, similar to the annual use of about 5,060 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Temporis CapitalNearby generating sites
- Auchrobert Β· 38.8 MW onshore wind farm8.0 km
- Blantyre Muir Wind Energy Ltd Β· 12.3 MW onshore wind farm8.4 km
- Kype Muir Wind Farm Β· 88.4 MW onshore wind farm9.6 km
- Stonebyres Β· 6 MW hydroelectric station9.8 km
- Nutberry Β· 15 MW onshore wind farm11.4 km
- Dungavel Β· 26 MW onshore wind farm12.1 km
- East Kilbride Β· 0.6 MW onshore wind farm12.3 km
- Dalquhandy Β· 42 MW onshore wind farm13.4 km
Also operated by Temporis Capital
Temporis Capital operates 20 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Lochhead Farm
- Developer / operator
- A7 Energy / Green Energy
- Planning authority
- South Lanarkshire
- Planning reference
- HM/05/0147
- Application submitted
- 1 April 2005
- Permission granted
- 1 May 2006
- Began operating
- 1 July 2009
- Capacity in planning record
- 6 MW
- Address
- Land at Lochhead Farm , Stonehouse, Strathclyde
- REPD reference
- 3453
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.