WIND Β· OPERATIONAL

Tullymurdoch

Tullymurdoch is a 14.4 MW onshore wind farm in Scotland, operated by Temporis Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland

Key facts

Installed capacity
14.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Temporis Capital
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PH11 8LH
Coordinates
56.6549, -3.3134

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Tullymurdoch compares

278th of 488largest wind farms in the UK register
154th of 199in Scotland
0.05%of listed UK wind farms capacity
β‰ˆ 33 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 14.4 MW station would generate roughly 33 GWh of electricity in a year, similar to the annual use of about 12,150 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Temporis Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Tullymurdoch Wind Farm
Developer / operator
Temporis Capital
Planning authority
Perth and Kinross
Planning reference
12/01423/FLL
Application submitted
13 August 2012
Permission granted
3 September 2014
Construction started
24 August 2017
Began operating
23 January 2018
Capacity in planning record
14.4 MW
Address
Alyth, Blairgowrie, Tayside, Tayside, PH10
REPD reference
4599

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026