Biggleswade
Biggleswade is a 20 MW onshore wind farm in East of England, England, operated by Temporis Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- East of England
- England
Key facts
- Installed capacity
- 20 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Temporis Capital
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SG18 9TA
- Coordinates
- 52.0468, -0.2275
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Biggleswade compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20 MW station would generate roughly 46 GWh of electricity in a year, similar to the annual use of about 16,870 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in East of England All run by Temporis CapitalNearby generating sites
- Waterloo Farm 1 and 2 Β· 28.7 MW solar farm11.9 km
- Vine Farm Β· 45.9 MW solar farm13.0 km
- Royston Β· 4.96 MW solar farm14.2 km
- Royston CIC Β· 4.9 MW solar farm14.2 km
- Bury Lane Β· 22.2 MW solar farm16.2 km
- Melbourn Muncey Farm Β· 30.9 MW solar farm16.4 km
- Little Barford GT Β· 17 MW oil-fired power station16.8 km
- Little Barford Β· 735 MW CCGT gas power station16.8 km
Also operated by Temporis Capital
Temporis Capital operates 20 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026