White Mill
White Mill is a 14.4 MW onshore wind farm in East of England, England, operated by Temporis Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- East of England
- England
Key facts
- Installed capacity
- 14.4 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Temporis Capital
- Region
- East of England
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PE14 0LX
- Coordinates
- 52.5926, 0.1406
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How White Mill compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 14.4 MW station would generate roughly 33 GWh of electricity in a year, similar to the annual use of about 12,110 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in East of England All run by Temporis CapitalNearby generating sites
- Stags Holt Β· 20 MW onshore wind farm2.8 km
- Wisbech Β· 3.4 MW solar farm5.5 km
- Glassmoor I Β· 16 MW onshore wind farm9.6 km
- Ransonmoor Β· 10 MW onshore wind farm11.6 km
- Greenvale March Β· 1.5 MW onshore wind farm12.6 km
- Burnthouse Β· 4.76 MW solar farm13.1 km
- Turves Β· 5 MW solar farm13.2 km
- Burnthouse Windfarm Β· 6 MW onshore wind farm13.3 km
Also operated by Temporis Capital
Temporis Capital operates 20 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Whitemill Wind Farm
- Developer / operator
- Co-operative Energy
- Planning authority
- Fenland
- Planning reference
- F/YR07/1184/F
- Application submitted
- 2 November 2007
- Permission granted
- 25 November 2008
- Began operating
- 2 May 2012
- Capacity in planning record
- 14 MW
- Address
- Coldham Estate, Coldham, Wisbech, Cambridgeshire, PE14 0LX
- REPD reference
- 3480
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.