SOLAR Β· OPERATIONAL

Wisbech

Wisbech is a 3.4 MW solar farm in East of England, England, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East of England
  • England
Project stageOperating
  1. PlanningOct 2014 (completed)
  2. ConsentedJan 2015 (completed)
  3. ConstructionOct 2015 (completed)
  4. OperatingDec 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
3.4 MW
Status
Operational
Technology
Solar Β· PV
Operator
Cubico Sustainable Investments
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE14 0AZ
Coordinates
52.6411, 0.1563

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wisbech compares

562nd of 662largest solar farms in the UK register
74th of 76in East of England
0.06%of listed UK solar farms capacity
β‰ˆ 3.0 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.4 MW station would generate roughly 3.0 GWh of electricity in a year, similar to the annual use of about 1,100 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by Cubico Sustainable Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Wisbech Solar Farm
Developer / operator
British Solar Renewables
Planning authority
Fenland
Planning reference
F/YR14/0856/F
Application submitted
24 October 2014
Permission granted
21 January 2015
Construction started
1 October 2015
Began operating
15 December 2015
Capacity in planning record
3.5 MW
Address
Land North of Begdale Road, Elm, Wisbech, Cambridgeshire, PE14 0BE
REPD reference
4736

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.