WIND Β· OPERATIONAL

Wandylaw

Wandylaw is a 20.5 MW onshore wind farm in North East England, operated by Cubico Sustainable Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North East
  • England
Project stageOperating
  1. PlanningAug 2006 (completed)
  2. ConsentedFeb 2008 (completed)
  3. ConstructionMay 2012 (completed)
  4. OperatingJul 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
20.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Cubico Sustainable Investments
Region
North East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
NE67 5HG
Coordinates
55.5196, -1.7642

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wandylaw compares

220th of 488largest wind farms in the UK register
8th of 41in North East
0.07%of listed UK wind farms capacity
β‰ˆ 47 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20.5 MW station would generate roughly 47 GWh of electricity in a year, similar to the annual use of about 17,290 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North East All run by Cubico Sustainable Investments

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Blue Energy
Planning authority
Northumberland
Planning reference
06/B/0765
Application submitted
1 August 2006
Permission granted
10 February 2008
Construction started
30 May 2012
Began operating
30 July 2013
Capacity in planning record
20.5 MW
Address
The Ellingham Estate, 3.5km West of the Village of Ellingham, Northumberland
REPD reference
4250

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.