Wingates
Wingates is a 15 MW onshore wind farm in North East England, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North East
- England
Key facts
- Installed capacity
- 15 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- North East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- NE65 8RW
- Coordinates
- 55.2753, -1.7964
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Wingates compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 15 MW station would generate roughly 34 GWh of electricity in a year, similar to the annual use of about 12,650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North East All run by Venitent Energy ServicesNearby generating sites
- North Steads Β· 18.5 MW onshore wind farm12.4 km
- Sisters Β· 8.2 MW onshore wind farm12.6 km
- Lynemouth Β· 26 MW wind farm18.2 km
- Lynemouth Power Limited Β· 420 MW biomass power station18.4 km
- Ray Β· 54.4 MW onshore wind farm20.3 km
- Kirkheaton Β· 1.8 MW onshore wind farm24.3 km
- Middlemoor Β· 54 MW onshore wind farm24.9 km
- Green Rigg Β· 36 MW onshore wind farm26.3 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Wingates Wind Farm
- Developer / operator
- Ventient (formerly Infinis)
- Planning authority
- Northumberland
- Planning reference
- C/09/00084/CCMEIA
- Application submitted
- 5 December 2008
- Permission granted
- 4 May 2011
- Construction started
- 1 August 2012
- Began operating
- 31 March 2013
- Capacity in planning record
- 15 MW
- Address
- Wingates, Longhorsley, Morpeth, Northampronshire. NE65 8, Northumberland
- REPD reference
- 3754
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.