Sisters
Sisters is a 8.2 MW onshore wind farm in North East England, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North East
- England
Key facts
- Installed capacity
- 8.2 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Venitent Energy Services
- Region
- North East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- NE61 5ED
- Coordinates
- 55.2539, -1.6008
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Sisters compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 8.2 MW station would generate roughly 19 GWh of electricity in a year, similar to the annual use of about 6,920 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North East All run by Venitent Energy ServicesNearby generating sites
- North Steads Β· 18.5 MW onshore wind farm2.0 km
- Lynemouth Power Limited Β· 420 MW biomass power station6.8 km
- Lynemouth Β· 26 MW wind farm7.0 km
- Wingates Β· 15 MW onshore wind farm12.6 km
- Blyth Β· 40 MW offshore wind farm18.6 km
- Middlemoor Β· 54 MW onshore wind farm29.2 km
- Kirkheaton Β· 1.8 MW onshore wind farm30.9 km
- Ray Β· 54.4 MW onshore wind farm30.9 km
Also operated by Venitent Energy Services
Venitent Energy Services operates 33 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Infinis (formerly Novera Energy)
- Planning authority
- Northumberland
- Planning reference
- 11/02481/RENEIA
- Application submitted
- 28 September 2011
- Permission granted
- 6 February 2013
- Construction started
- 27 July 2015
- Began operating
- 30 July 2016
- Capacity in planning record
- 8.2 MW
- Address
- west of Widdrington, approximately 8km north of Ashington, Northumberland, Northumberland
- REPD reference
- 4167
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.