Middlemoor
Middlemoor is a 54 MW onshore wind farm in North East England, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North East
- England
Key facts
- Installed capacity
- 54 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- RWE Npower
- Region
- North East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 55.4986, -1.7678
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Middlemoor compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 54 MW station would generate roughly 123 GWh of electricity in a year, similar to the annual use of about 45,550 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North East All run by RWE NpowerNearby generating sites
- Wandylaw Β· 20.5 MW onshore wind farm2.3 km
- Barmoor Β· 12 MW onshore wind farm23.7 km
- Wingates Β· 15 MW onshore wind farm24.9 km
- North Steads Β· 18.5 MW onshore wind farm27.3 km
- Sisters Β· 8.2 MW onshore wind farm29.2 km
- Lynemouth Power Limited Β· 420 MW biomass power station35.7 km
- Lynemouth Β· 26 MW wind farm36.0 km
- Ray Β· 54.4 MW onshore wind farm40.1 km
Also operated by RWE Npower
RWE Npower operates 90 sites in the register. Largest first:
- Pembroke Β· gas-fired power station2,199 MW
- Didcot A Power Station Β· coal-fired power station2,000 MW
- Staythorpe Β· CCGT gas power station1,828 MW
- Didcot B Β· gas-fired power station1,450 MW
- Tilbury B Power Station Β· coal-fired power station1,050 MW
- Triton Knoll Β· offshore wind farm857 MW
- Little Barford Β· CCGT gas power station735 MW
- London Array Β· offshore wind farm630 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Npower Renewables
- Planning authority
- Northumberland
- Planning reference
- ELEC/2005/0004
- Application submitted
- 7 December 2005
- Permission granted
- 7 August 2008
- Construction started
- 1 March 2012
- Began operating
- 30 September 2013
- Capacity in planning record
- 54 MW
- Address
- North Charlton Alnwick Northumberland, Northumberland
- REPD reference
- 4019
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.