Grange Wind Farm (GB)

Grange Wind Farm (GB) is a 14 MW onshore wind farm in East Midlands England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England
Project stageOperating
  1. PlanningJun 2009 (completed)
  2. ConsentedOct 2010 (completed)
  3. ConstructionSep 2012 (completed)
  4. OperatingMar 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
14 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE13 5RB
Coordinates
52.7469, 0.1475

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Grange Wind Farm (GB) compares

282nd of 488largest wind farms in the UK register
14th of 34in East Midlands
0.05%of listed UK wind farms capacity
β‰ˆ 32 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 14 MW station would generate roughly 32 GWh of electricity in a year, similar to the annual use of about 11,810 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
The Grange Wind Farm
Developer / operator
Renewable Energy Systems (RES)
Planning authority
South Holland
Planning reference
H21-0439-09
Application submitted
17 June 2009
Permission granted
15 October 2010
Construction started
1 September 2012
Began operating
1 March 2013
Capacity in planning record
14 MW
Address
Middle Road, Tydd St. Mary, Wisbech, Cambridge, Lincolnshire, PE13 5QZ
REPD reference
3671

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source