πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Moor Solar 2

Moor Solar 2 is a 1.07 MW solar farm in East Midlands England, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningMar 2011 (completed)
  2. ConsentedApr 2011 (completed)
  3. Construction (completed)
  4. OperatingJul 2011 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
1.07 MW
Status
Operational
Technology
Solar Β· PV
Operator
Lightsource BP
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE12 9LE
Coordinates
52.7904, 0.1359

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Moor Solar 2 compares

643rd of 662largest solar farms in the UK register
91st of 95in East Midlands
0.02%of listed UK solar farms capacity
β‰ˆ 0.9 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 1.07 MW station would generate roughly 0.9 GWh of electricity in a year, similar to the annual use of about 350 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Lightsource BP

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Long Sutton Butterfly And Wildlife Park (extension)
Developer / operator
Moor Solar
Planning authority
South Holland
Planning reference
H11-0206-11
Application submitted
18 March 2011
Permission granted
28 April 2011
Began operating
14 July 2011
Capacity in planning record
1 MW
Address
Little London, Spalding, Lincolnshire, Lincolnshire, PE12 9LE
REPD reference
1050

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.