Red House

Red House is a 12 MW onshore wind farm in East Midlands England, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East Midlands
  • England

Key facts

Installed capacity
12 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
EDF Energy
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE12 9NG
Coordinates
52.8398, 0.1067

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Red House compares

305th of 488largest wind farms in the UK register
18th of 34in East Midlands
0.04%of listed UK wind farms capacity
β‰ˆ 27 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 12 MW station would generate roughly 27 GWh of electricity in a year, similar to the annual use of about 10,120 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East Midlands All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Gedney Marsh
Developer / operator
Wind Prospect
Planning authority
South Holland
Planning reference
H06/0035/03
Application submitted
14 January 2003
Permission granted
27 September 2003
Construction started
1 May 2006
Began operating
15 July 2008
Capacity in planning record
12 MW
Address
Gedney Marsh Gedney Drove End Lincolnshire, Lincolnshire
REPD reference
3133

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.