Griffin Wind Farm is a 189 MW onshore wind farm in Scotland, operated by SSE Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningApr 2004 (completed)
  2. ConsentedJan 2008 (completed)
  3. ConstructionJul 2010 (completed)
  4. OperatingFeb 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
189 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
SSE Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
56.5812, -3.7338

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Griffin Wind Farm compares

36th of 488largest wind farms in the UK register
14th of 199in Scotland
0.64%of listed UK wind farms capacity
β‰ˆ 430 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 189 MW station would generate roughly 430 GWh of electricity in a year, similar to the annual use of about 159,090 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by SSE Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Greenpower (Griffin) Ltd
Planning authority
Scottish Government (S36)
Application submitted
27 April 2004
Permission granted
31 January 2008
Construction started
1 July 2010
Began operating
28 February 2012
Capacity in planning record
156 MW
Address
Griffin Forest, Tayside
REPD reference
4028

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.