πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Beatrice Offshore windfarm

Beatrice Offshore windfarm is a 588 MW offshore wind farm in Scotland, operated by SSE Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • Scotland
Project stageOperating
  1. PlanningApr 2012 (completed)
  2. ConsentedMar 2014 (completed)
  3. ConstructionApr 2017 (completed)
  4. OperatingAug 2019 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
588 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
SSE Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
58.0882, -2.9502

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Beatrice Offshore windfarm compares

9th of 488largest wind farms in the UK register
4th of 199in Scotland
2.0%of listed UK wind farms capacity
β‰ˆ 1,957 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 588 MW station would generate roughly 1,957 GWh of electricity in a year, similar to the annual use of about 724,940 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by SSE Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Beatrice
Developer / operator
Scottish & Southern Energy (SSE) / Repsol / CIP
Planning authority
Scottish Government (S36)
Application submitted
25 April 2012
Permission granted
19 March 2014
Construction started
2 April 2017
Began operating
5 August 2019
Capacity in planning record
588 MW
Address
Offshore Scottish borders, Offshore
REPD reference
2521

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.