WIND Β· OPERATIONAL

Moray Offshore Windfarm East Limited

Moray Offshore Windfarm East Limited is a 950 MW offshore wind farm in Scotland, operated by Moray Offshore Windfarm (East) Ltd. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Offshore
  • Scotland
Project stageOperating
  1. PlanningAug 2012 (completed)
  2. ConsentedMar 2014 (completed)
  3. ConstructionJun 2019 (completed)
  4. OperatingApr 2022 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
950 MW
Status
Operational
Technology
Wind Β· Offshore
Operator
Moray Offshore Windfarm (East) Ltd
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
AB43 9BR
Coordinates
58.1671, -2.6985

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Moray Offshore Windfarm East Limited compares

4th of 488largest wind farms in the UK register
2nd of 199in Scotland
3.2%of listed UK wind farms capacity
β‰ˆ 3,162 GWhillustrative output a year

At a typical UK load factor for this technology (about 38% of the maximum possible output), a 950 MW station would generate roughly 3,162 GWh of electricity in a year, similar to the annual use of about 1,171,240 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Moray Offshore Windfarm (East) Ltd

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Moray East
Developer / operator
Diamond Green Limited, CTG & Ocean Winds
Planning authority
Scottish Government (S36)
Application submitted
28 August 2012
Permission granted
19 March 2014
Construction started
6 June 2019
Began operating
1 April 2022
Capacity in planning record
950 MW
Address
Smith Bank, Moray Firth - 13miles off Lybster, Offshore
REPD reference
2534

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.