Moray Offshore Windfarm East Limited
Moray Offshore Windfarm East Limited is a 950 MW offshore wind farm in Scotland, operated by Moray Offshore Windfarm (East) Ltd. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Offshore
- Scotland
Key facts
- Installed capacity
- 950 MW
- Status
- Operational
- Technology
- Wind Β· Offshore
- Operator
- Moray Offshore Windfarm (East) Ltd
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- AB43 9BR
- Coordinates
- 58.1671, -2.6985
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Moray Offshore Windfarm East Limited compares
At a typical UK load factor for this technology (about 38% of the maximum possible output), a 950 MW station would generate roughly 3,162 GWh of electricity in a year, similar to the annual use of about 1,171,240 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Moray Offshore Windfarm (East) LtdNearby generating sites
- Beatrice Offshore windfarm Β· 588 MW offshore wind farm17.2 km
- Moray Offshore Windfarm West Limited Β· 882 MW offshore wind farm19.7 km
- Burn of Whilk Β· 22.5 MW onshore wind farm38.3 km
- Achairn Β· 6 MW onshore wind farm42.1 km
- Camster Β· 50 MW onshore wind farm42.9 km
- Bilbster Β· 3.9 MW onshore wind farm44.9 km
- Bad a Cheo Β· 26.7 MW onshore wind farm51.2 km
- Stroupster Β· 29.9 MW onshore wind farm52.3 km
Also operated by Moray Offshore Windfarm (East) Ltd
Moray Offshore Windfarm (East) Ltd operates 2 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Moray East
- Developer / operator
- Diamond Green Limited, CTG & Ocean Winds
- Planning authority
- Scottish Government (S36)
- Application submitted
- 28 August 2012
- Permission granted
- 19 March 2014
- Construction started
- 6 June 2019
- Began operating
- 1 April 2022
- Capacity in planning record
- 950 MW
- Address
- Smith Bank, Moray Firth - 13miles off Lybster, Offshore
- REPD reference
- 2534
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.