WIND Β· OPERATIONAL

Kilbraur

Kilbraur is a 67.5 MW onshore wind farm in Scotland, operated by Falck Renewables SpA. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningSep 2003 (completed)
  2. ConsentedApr 2006 (completed)
  3. ConstructionSep 2007 (completed)
  4. OperatingJun 2008 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
67.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Falck Renewables SpA
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Coordinates
58.0404, -4.0588

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Kilbraur compares

78th of 488largest wind farms in the UK register
38th of 199in Scotland
0.23%of listed UK wind farms capacity
β‰ˆ 154 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 67.5 MW station would generate roughly 154 GWh of electricity in a year, similar to the annual use of about 56,940 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Falck Renewables SpA

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Kilbraur Windfarm
Developer / operator
Renewable Development Company (RDC)
Planning authority
Highland
Planning reference
SU2004125
Application submitted
4 September 2003
Permission granted
1 April 2006
Construction started
1 September 2007
Began operating
14 June 2008
Capacity in planning record
47.5 MW
Address
Rogart, Sutherland (former Strath Brora Site), Highland
REPD reference
3202

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.