πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
WIND Β· OPERATIONAL

Rosehall

Rosehall is a 24.7 MW onshore wind farm in Scotland, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningNov 2005 (completed)
  2. ConsentedSep 2006 (completed)
  3. ConstructionAug 2011 (completed)
  4. OperatingFeb 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
24.7 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RWE Npower
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
IV27 4BD
Coordinates
57.9956, -4.5470

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Rosehall compares

200th of 488largest wind farms in the UK register
125th of 199in Scotland
0.08%of listed UK wind farms capacity
β‰ˆ 56 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 24.7 MW station would generate roughly 56 GWh of electricity in a year, similar to the annual use of about 20,840 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Rosehall Hill Forest Windfarm
Developer / operator
E.ON UK
Planning authority
Highland
Planning reference
05/00429/FULSU
Application submitted
30 November 2005
Permission granted
30 September 2006
Construction started
1 August 2011
Began operating
28 February 2013
Capacity in planning record
24.7 MW
Address
Lairg, Highlands. IV27 4EU, Highland
REPD reference
4051

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.