Greendykeside
Greendykeside is a 4 MW onshore wind farm in Scotland, operated by Temporis Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 4 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Temporis Capital
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- ML6 7TT
- Coordinates
- 55.9120, -3.9032
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Greendykeside compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 4 MW station would generate roughly 9.1 GWh of electricity in a year, similar to the annual use of about 3,370 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Temporis CapitalNearby generating sites
- Burnhead Moss Β· 26 MW onshore wind farm7.5 km
- Harthill Torrance Β· 5.7 MW onshore wind farm11.5 km
- West Benhar Β· 30.1 MW onshore wind farm12.1 km
- Falkirk Tod Hill Β· 11.4 MW onshore wind farm13.6 km
- Scotia Wind (Craigengelt) Ltd Β· 20 MW onshore wind farm18.3 km
- Black Law II Β· 63.4 MW onshore wind farm18.8 km
- Black Law I Β· 124 MW onshore wind farm19.1 km
- Longannet Power Station Β· 2,400 MW coal-fired power station20.3 km
Also operated by Temporis Capital
Temporis Capital operates 20 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- A7 Energy
- Planning authority
- North Lanarkshire
- Planning reference
- 04/01624/FUL
- Application submitted
- 13 September 2004
- Permission granted
- 11 May 2005
- Began operating
- 1 November 2007
- Capacity in planning record
- 4 MW
- Address
- Greendykeside Farm , Longriggend , Airdrie , Lanarkshire, Strathclyde, ML6 7TT
- REPD reference
- 3236
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.