WIND Β· OPERATIONAL

Black Law II

Black Law II is a 63.4 MW onshore wind farm in Scotland, operated by Scottish Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningJan 2008 (completed)
  2. ConsentedMar 2011 (completed)
  3. ConstructionSep 2014 (completed)
  4. OperatingFeb 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
63.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Scottish Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
ML11 8EW
Coordinates
55.7622, -3.7626

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Black Law II compares

86th of 488largest wind farms in the UK register
45th of 199in Scotland
0.22%of listed UK wind farms capacity
β‰ˆ 144 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 63.4 MW station would generate roughly 144 GWh of electricity in a year, similar to the annual use of about 53,510 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Scottish Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Black Law Extension - 1a
Developer / operator
Scottish Power Renewables
Planning authority
Scottish Government (S36)
Application submitted
25 January 2008
Permission granted
22 March 2011
Construction started
30 September 2014
Began operating
18 February 2016
Capacity in planning record
48.4 MW
Address
Black Law, Climpy, Strathclyde
REPD reference
4253

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.