WIND Β· OPERATIONAL

West Benhar

West Benhar is a 30.1 MW onshore wind farm in Scotland, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningJul 2013 (completed)
  2. ConsentedSep 2015 (completed)
  3. ConstructionMar 2021 (completed)
  4. OperatingJan 2023 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
30.1 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
EDF Energy
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
ML7 5TF
Coordinates
55.8363, -3.7650

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How West Benhar compares

158th of 488largest wind farms in the UK register
92nd of 199in Scotland
0.10%of listed UK wind farms capacity
β‰ˆ 69 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 30.1 MW station would generate roughly 69 GWh of electricity in a year, similar to the annual use of about 25,390 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by EDF Energy

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
West Benhar wind farm
Developer / operator
EDF Energy Renewables
Planning authority
North Lanarkshire
Planning reference
13/01377/FUL
Application submitted
25 July 2013
Permission granted
11 September 2015
Construction started
1 March 2021
Began operating
1 January 2023
Capacity in planning record
27.2 MW
Address
West Benhar Wind Farm North Of Rimmon Cottage Benhar Road Shotts, Strathclyde, ML7 5TF
REPD reference
4307

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.