WIND Β· OPERATIONAL

Penny Hill Wind Farm

Penny Hill Wind Farm is a 20.4 MW onshore wind farm in Yorkshire and the Humber, England, operated by The Banks Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Yorkshire and the Humber
  • England
Project stageOperating
  1. PlanningJul 2009 (completed)
  2. ConsentedMay 2010 (completed)
  3. ConstructionJul 2012 (completed)
  4. OperatingMar 2013 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
20.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
The Banks Group
Region
Yorkshire and the Humber
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
S66 9BH
Coordinates
53.3834, -1.2975

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Penny Hill Wind Farm compares

224th of 488largest wind farms in the UK register
13th of 31in Yorkshire and the Humber
0.07%of listed UK wind farms capacity
β‰ˆ 46 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 20.4 MW station would generate roughly 46 GWh of electricity in a year, similar to the annual use of about 17,210 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Yorkshire and the Humber All run by The Banks Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Penny Hill Lane
Developer / operator
Banks Renewables
Planning authority
Rotherham
Planning reference
RB2009/0824
Application submitted
22 July 2009
Permission granted
27 May 2010
Construction started
26 July 2012
Began operating
31 March 2013
Capacity in planning record
19.8 MW
Address
Ulley, Sheffield, South Yorks. S26 3YA, South Yorkshire
REPD reference
3677

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.