Middle Muir Wind Farm

Middle Muir Wind Farm is a 51 MW onshore wind farm in Scotland, operated by The Banks Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningFeb 2012 (completed)
  2. ConsentedSep 2014 (completed)
  3. ConstructionJan 2017 (completed)
  4. OperatingMay 2019 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
51 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
The Banks Group
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
ML12 6SZ
Coordinates
55.5087, -3.7597

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Middle Muir Wind Farm compares

103rd of 488largest wind farms in the UK register
52nd of 199in Scotland
0.17%of listed UK wind farms capacity
β‰ˆ 116 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 51 MW station would generate roughly 116 GWh of electricity in a year, similar to the annual use of about 43,020 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by The Banks Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Developer / operator
Banks Renewables
Planning authority
Scottish Government (S36)
Planning reference
CL/12/0056
Application submitted
7 February 2012
Permission granted
26 September 2014
Construction started
16 January 2017
Began operating
16 May 2019
Capacity in planning record
51 MW
Address
Middle Muir, Hamilton, Strathclyde (north of Crawfordjohn), Strathclyde, ML3
REPD reference
4440

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.