Clyde Windfarm (Central) is a 196 MW onshore wind farm in Scotland, operated by SSE Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 196 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- SSE Group
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 55.4865, -3.5445
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Clyde Windfarm (Central) compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 196 MW station would generate roughly 446 GWh of electricity in a year, similar to the annual use of about 165,250 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by SSE GroupNearby generating sites
- Clyde Windfarm (North) Β· 198 MW onshore wind farm5.0 km
- Clyde Windfarm (South) Β· 129 MW onshore wind farm5.0 km
- Glenkerie Β· 22 MW onshore wind farm9.7 km
- Middle Muir Wind Farm Β· 51 MW onshore wind farm13.8 km
- Andershaw Β· 36 MW onshore wind farm19.2 km
- Douglas West Β· 44.9 MW onshore wind farm22.4 km
- Bonnington Β· 11 MW hydroelectric station23.5 km
- Dalquhandy Β· 42 MW onshore wind farm24.5 km
Also operated by SSE Group
SSE Group operates 127 sites in the register. Largest first:
- Peterhead Β· gas-fired power station1,180 MW
- Seagreen Β· offshore wind farm1,075 MW
- Keadby 2 Β· gas-fired power station840 MW
- Medway Β· gas-fired power station755 MW
- Keadby Β· CCGT gas power station735 MW
- Beatrice Offshore windfarm Β· offshore wind farm588 MW
- Greater Gabbard Β· offshore wind farm504 MW
- Viking Wind Farm Β· onshore wind farm443 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Clyde Wind Farm Extension (Clyde 2)
- Developer / operator
- Scottish and Southern Energy (SSE)/ GIB
- Planning authority
- Scottish Government (S36)
- Planning reference
- EC00003160
- Application submitted
- 10 October 2011
- Permission granted
- 23 July 2014
- Construction started
- 20 July 2015
- Began operating
- 15 August 2017
- Capacity in planning record
- 173 MW
- Address
- Upper Clyde Valley, surrounding Camps Reservoir, Strathclyde
- REPD reference
- 4178
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.