WIND Β· OPERATIONAL

Glenkerie

Glenkerie is a 22 MW onshore wind farm in Scotland, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningDec 2007 (completed)
  2. ConsentedSep 2008 (completed)
  3. ConstructionApr 2011 (completed)
  4. OperatingFeb 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
22 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Venitent Energy Services
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
ML12 6QL
Coordinates
55.5385, -3.4205

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Glenkerie compares

212th of 488largest wind farms in the UK register
129th of 199in Scotland
0.07%of listed UK wind farms capacity
β‰ˆ 50 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 22 MW station would generate roughly 50 GWh of electricity in a year, similar to the annual use of about 18,560 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Venitent Energy Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Glenkerie Wind Farm
Developer / operator
Novera Energy
Planning authority
Scottish Borders
Planning reference
07/02478/FUL
Application submitted
20 December 2007
Permission granted
8 September 2008
Construction started
1 April 2011
Began operating
1 February 2012
Capacity in planning record
22 MW
Address
Kingledores Farm, Broughton, Biggar, Strathclyde. ML12 6QL, Borders
REPD reference
3538

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.