Bowbeat (Emly Bank) - RO

Bowbeat (Emly Bank) - RO is a 15.6 MW onshore wind farm in Scotland, operated by RWE Npower. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningMar 2000 (completed)
  2. ConsentedAug 2000 (completed)
  3. Construction (completed)
  4. OperatingSep 2002 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
15.6 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RWE Npower
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
EH23 4AE
Coordinates
55.7158, -3.1221

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bowbeat (Emly Bank) - RO compares

266th of 488largest wind farms in the UK register
149th of 199in Scotland
0.05%of listed UK wind farms capacity
β‰ˆ 36 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 15.6 MW station would generate roughly 36 GWh of electricity in a year, similar to the annual use of about 13,160 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by RWE Npower

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bowbeat Emly Bank / Rough Side
Developer / operator
PowerGen and Natural Power
Planning authority
Scottish Borders
Planning reference
00/00371/FUL
Application submitted
23 March 2000
Permission granted
14 August 2000
Began operating
15 September 2002
Capacity in planning record
31.2 MW
Address
Roughside Moss, Peebles, Borders
REPD reference
3299

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.