Longpark
Longpark is a 38 MW onshore wind farm in Scotland, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 38 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- EDF Energy
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- TD1 2SW
- Coordinates
- 55.6692, -2.8275
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Longpark compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 38 MW station would generate roughly 87 GWh of electricity in a year, similar to the annual use of about 32,060 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by EDF EnergyNearby generating sites
- Toddleburn Windfarm Β· 27.6 MW onshore wind farm11.5 km
- Dun Law II Β· 29.8 MW onshore wind farm15.5 km
- Bowbeat (Roughside) - RO Β· 15.6 MW onshore wind farm15.6 km
- Dun Law I Β· 17.2 MW onshore wind farm15.8 km
- Carcant Wind Farm Β· 6 MW onshore wind farm16.0 km
- Bowbeat (Emly Bank) - RO Β· 15.6 MW onshore wind farm19.2 km
- Fallago Rig Β· 144 MW onshore wind farm20.0 km
- Langhope Rig Β· 16.4 MW onshore wind farm28.0 km
Also operated by EDF Energy
EDF Energy operates 48 sites in the register. Largest first:
- Hinkley Point C Β· nuclear power station3,260 MW
- West Burton A Power Station Β· coal-fired power station2,012 MW
- Cottam Power Station Β· coal-fired power station2,008 MW
- Heysham 2 Β· nuclear power station1,240 MW
- Torness Β· nuclear power station1,200 MW
- Sizewell B Β· nuclear power station1,198 MW
- Hartlepool Β· nuclear power station1,185 MW
- Heysham 1 Β· nuclear power station1,060 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Wind Prospect
- Planning authority
- Scottish Borders
- Planning reference
- 04/00317/FUL
- Application submitted
- 16 February 2004
- Permission granted
- 31 August 2005
- Construction started
- 1 June 2009
- Began operating
- 1 September 2009
- Capacity in planning record
- 38 MW
- Address
- Stow, Borders
- REPD reference
- 3605
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.