Fallago Rig is a 144 MW onshore wind farm in Scotland, operated by EDF Energy. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 144 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- EDF Energy
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- TD3 6NW
- Coordinates
- 55.8313, -2.6880
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Fallago Rig compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 144 MW station would generate roughly 328 GWh of electricity in a year, similar to the annual use of about 121,470 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by EDF EnergyNearby generating sites
- Dun Law II Β· 29.8 MW onshore wind farm10.7 km
- Crystal Rig II Β· 138 MW onshore wind farm12.5 km
- Dun Law I Β· 17.2 MW onshore wind farm12.6 km
- Crystal Rig Β· 62.5 MW onshore wind farm13.0 km
- Toddleburn Windfarm Β· 27.6 MW onshore wind farm13.7 km
- Aikengall Β· 48 MW onshore wind farm15.6 km
- Aikengall II Β· 60.8 MW onshore wind farm15.6 km
- Aikengall IIA Β· 81.7 MW onshore wind farm16.2 km
Also operated by EDF Energy
EDF Energy operates 48 sites in the register. Largest first:
- Hinkley Point C Β· nuclear power station3,260 MW
- West Burton A Power Station Β· coal-fired power station2,012 MW
- Cottam Power Station Β· coal-fired power station2,008 MW
- Heysham 2 Β· nuclear power station1,240 MW
- Torness Β· nuclear power station1,200 MW
- Sizewell B Β· nuclear power station1,198 MW
- Hartlepool Β· nuclear power station1,185 MW
- Heysham 1 Β· nuclear power station1,060 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- EDF Energy Renewables
- Planning authority
- Scottish Government (S36)
- Application submitted
- 16 May 2005
- Permission granted
- 9 November 2010
- Construction started
- 1 March 2011
- Began operating
- 31 March 2013
- Capacity in planning record
- 144 MW
- Address
- Lammermuir Hills, Borders
- REPD reference
- 4059
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.