Aikengall IIA
Aikengall IIA is a 81.7 MW onshore wind farm in Scotland, operated by Community Wind Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 81.7 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Community Wind Power
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Coordinates
- 55.8934, -2.4526
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Aikengall IIA compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 81.7 MW station would generate roughly 186 GWh of electricity in a year, similar to the annual use of about 68,920 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Community Wind PowerNearby generating sites
- Aikengall Β· 48 MW onshore wind farm3.5 km
- Aikengall II Β· 60.8 MW onshore wind farm3.5 km
- Crystal Rig Β· 62.5 MW onshore wind farm3.8 km
- Crystal Rig II Β· 138 MW onshore wind farm4.8 km
- Crystal Rig III Β· 13.8 MW onshore wind farm6.5 km
- Quixwood Moor Β· 26.7 MW onshore wind farm6.9 km
- Penmanshiel Β· 28.7 MW onshore wind farm8.2 km
- Black Hill Wind Farm Β· 28.6 MW onshore wind farm10.6 km
Also operated by Community Wind Power
Community Wind Power operates 8 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Aikengall IIa Community Wind Farm
- Developer / operator
- Community Windpower
- Planning authority
- Scottish Government (S36)
- Application submitted
- 1 February 2014
- Permission granted
- 19 October 2016
- Construction started
- 1 January 2021
- Began operating
- 1 November 2021
- Capacity in planning record
- 81.7 MW
- Address
- Land North Of Nether Monynut Cottage Cockburnspath Scottish Borders, Borders
- REPD reference
- 4591
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.