Crystal Rig III
Crystal Rig III is a 13.8 MW onshore wind farm in Scotland, operated by Fred Olsen Renewables. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 13.8 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Fred Olsen Renewables
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- EH42 1SH
- Coordinates
- 55.9444, -2.5049
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Crystal Rig III compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 13.8 MW station would generate roughly 31 GWh of electricity in a year, similar to the annual use of about 11,640 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Fred Olsen RenewablesNearby generating sites
- Aikengall Β· 48 MW onshore wind farm3.2 km
- Aikengall II Β· 60.8 MW onshore wind farm3.2 km
- Crystal Rig II Β· 138 MW onshore wind farm5.2 km
- Crystal Rig Β· 62.5 MW onshore wind farm5.5 km
- Aikengall IIA Β· 81.7 MW onshore wind farm6.5 km
- Penmanshiel Β· 28.7 MW onshore wind farm12.6 km
- Quixwood Moor Β· 26.7 MW onshore wind farm12.8 km
- Drone Hill Β· 28.6 MW onshore wind farm16.0 km
Also operated by Fred Olsen Renewables
Fred Olsen Renewables operates 9 sites in the register. Largest first:
- Crystal Rig II Β· onshore wind farm138 MW
- Mid Hill Β· onshore wind farm75.9 MW
- Pauls Hill Β· onshore wind farm64.4 MW
- Crystal Rig Β· onshore wind farm62.5 MW
- Brockloch Rig Β· onshore wind farm61.5 MW
- Rothes Β· onshore wind farm50.6 MW
- Rothes II Β· onshore wind farm41.4 MW
- Brockloch Rig 1 Β· onshore wind farm21.6 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Crystal Rig Wind Farm Phase III
- Developer / operator
- Fred Olsen Renewables
- Planning authority
- Scottish Government (S36)
- Application submitted
- 14 June 2013
- Permission granted
- 18 June 2015
- Construction started
- 15 January 2016
- Began operating
- 22 December 2016
- Capacity in planning record
- 13.8 MW
- Address
- Crystal Rigg Wind Farm, Cranshaws Duns, Scottish Borders, Borders, TD11 3SR
- REPD reference
- 4215
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026