Crystal Rig II

Crystal Rig II is a 138 MW onshore wind farm in Scotland, operated by Fred Olsen Renewables. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland
Project stageOperating
  1. PlanningJul 2007 (completed)
  2. ConsentedJul 2008 (completed)
  3. ConstructionMar 2010 (completed)
  4. OperatingOct 2010 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
138 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Fred Olsen Renewables
Region
Scotland
Country
Scotland
Grid connection (DUKES)
HV
Combined heat & power
No
Postcode
EH42 1SH
Coordinates
55.8995, -2.5293

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Crystal Rig II compares

44th of 488largest wind farms in the UK register
17th of 199in Scotland
0.47%of listed UK wind farms capacity
β‰ˆ 314 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 138 MW station would generate roughly 314 GWh of electricity in a year, similar to the annual use of about 116,410 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Fred Olsen Renewables

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Crystal Rig Wind Farm Phase 2a
Developer / operator
Fred Olsen Renewables
Planning authority
Scottish Government (S36)
Application submitted
17 July 2007
Permission granted
30 July 2008
Construction started
1 March 2010
Began operating
25 October 2010
Capacity in planning record
138 MW
Address
Dundfar Common, Eastern Lammermuirs, Borders
REPD reference
3440

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.