WIND Β· OPERATIONAL

Millour Hill Ext.

Millour Hill Ext. is a 6.4 MW onshore wind farm in Scotland, operated by Community Wind Power. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • Scotland

Key facts

Installed capacity
6.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Community Wind Power
Region
Scotland
Country
Scotland
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
KA24 5AW
Coordinates
55.7337, -4.7776

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Millour Hill Ext. compares

386th of 488largest wind farms in the UK register
182nd of 199in Scotland
0.02%of listed UK wind farms capacity
β‰ˆ 15 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 6.4 MW station would generate roughly 15 GWh of electricity in a year, similar to the annual use of about 5,400 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in Scotland All run by Community Wind Power

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Millour Hill Community Windfarm (Extension)
Developer / operator
Community Windpower
Planning authority
North Ayrshire
Planning reference
13/00647/PP
Application submitted
21 November 2013
Permission granted
18 June 2014
Construction started
15 January 2016
Began operating
31 March 2016
Capacity in planning record
6.4 MW
Address
Site To North Of Baidland Hill Dalry Ayrshire, Strathclyde
REPD reference
4235

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026