Douglas West
Douglas West is a 44.9 MW onshore wind farm in Scotland, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- Scotland
Key facts
- Installed capacity
- 44.9 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- Greencoat Capital
- Region
- Scotland
- Country
- Scotland
- Grid connection (DUKES)
- HV
- Combined heat & power
- No
- Postcode
- ML11 0LU
- Coordinates
- 55.5650, -3.8728
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Douglas West compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 44.9 MW station would generate roughly 102 GWh of electricity in a year, similar to the annual use of about 37,830 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in Scotland All run by Greencoat CapitalNearby generating sites
- Dalquhandy Β· 42 MW onshore wind farm2.7 km
- Hagshaw Hill II Β· 26 MW onshore wind farm3.2 km
- Cumberhead Wind Farm Β· 50 MW onshore wind farm4.8 km
- Nutberry Β· 15 MW onshore wind farm4.9 km
- Andershaw Β· 36 MW onshore wind farm6.4 km
- Galawhistle Β· 66 MW onshore wind farm7.0 km
- Middle Muir Wind Farm Β· 51 MW onshore wind farm9.5 km
- Auchrobert Β· 38.8 MW onshore wind farm9.6 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Douglas West and Dalquhandy Renewable Energy Project
- Developer / operator
- Greencoat (formerly 3R Energy/Blue Energy) / BayWa r.e
- Planning authority
- South Lanarkshire
- Planning reference
- CL/15/0273
- Application submitted
- 16 July 2015
- Permission granted
- 2 February 2016
- Construction started
- 28 March 2021
- Began operating
- 1 January 2023
- Capacity in planning record
- 45 MW
- Address
- Douglas West and Dalquhandy, F, Lesmahagow, Site West of Junction 11 of M7, Lanark, Strathclyde, South Lanarkshire, ML11 0
- REPD reference
- 5393
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.