Moor House Wind Farm
Moor House Wind Farm is a 12 MW onshore wind farm in North East England, operated by The Banks Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- Onshore
- North East
- England
Key facts
- Installed capacity
- 12 MW
- Status
- Operational
- Technology
- Wind Β· Onshore
- Operator
- The Banks Group
- Region
- North East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- DL2 1SN
- Coordinates
- 54.5746, -1.4972
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Moor House Wind Farm compares
At a typical UK load factor for this technology (about 26% of the maximum possible output), a 12 MW station would generate roughly 27 GWh of electricity in a year, similar to the annual use of about 10,120 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.
All UK wind farms Wind farms in North East All run by The Banks GroupNearby generating sites
- High Meadow Β· 3.89 MW solar farm7.0 km
- School Aycliffe Β· 5 MW solar farm7.4 km
- Hunger Hill Β· 5 MW solar farm7.6 km
- Lambs Hill Wind Farm Β· 8 MW onshore wind farm11.5 km
- Butterwick Moor Circuit 1 Β· 9.4 MW onshore wind farm11.8 km
- Walkway Β· 14 MW onshore wind farm11.8 km
- Butterwick Moor Circuit 2 Β· 9.4 MW onshore wind farm11.8 km
- Red Gap Β· 12.5 MW onshore wind farm13.9 km
Also operated by The Banks Group
The Banks Group operates 12 sites in the register. Largest first:
- Kype Muir Wind Farm Β· onshore wind farm88.4 MW
- Middle Muir Wind Farm Β· onshore wind farm51 MW
- Penny Hill Wind Farm Β· onshore wind farm20.4 MW
- Pates Hill Β· onshore wind farm14 MW
- Milton Keynes Β· onshore wind farm14 MW
- Armistead Wind Farm Β· onshore wind farm12.3 MW
- Hook Moor Wind Farm Β· onshore wind farm10 MW
- Marr Wind Farm Β· onshore wind farm8.2 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- Banks Renewables
- Planning authority
- Darlington
- Planning reference
- 11/00160/FUL
- Application submitted
- 14 March 2011
- Permission granted
- 19 October 2011
- Construction started
- 16 January 2017
- Began operating
- 15 December 2017
- Capacity in planning record
- 12 MW
- Address
- Bishopton Lane, Great Burdon, Darlington, County Durham
- REPD reference
- 4642
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.