WIND Β· OPERATIONAL

Lambs Hill Wind Farm

Lambs Hill Wind Farm is a 8 MW onshore wind farm in North East England, operated by The Banks Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North East
  • England
Project stageOperating
  1. PlanningOct 2010 (completed)
  2. ConsentedDec 2011 (completed)
  3. ConstructionFeb 2016 (completed)
  4. OperatingJan 2017 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
8 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
The Banks Group
Region
North East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TS21 1LX
Coordinates
54.5462, -1.3263

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Lambs Hill Wind Farm compares

365th of 488largest wind farms in the UK register
20th of 41in North East
0.03%of listed UK wind farms capacity
β‰ˆ 18 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 8 MW station would generate roughly 18 GWh of electricity in a year, similar to the annual use of about 6,750 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North East All run by The Banks Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Lambs Hill
Developer / operator
Banks Renewables
Planning authority
Stockton-on-Tees
Planning reference
10/2549/EIS
Application submitted
7 October 2010
Permission granted
7 December 2011
Construction started
26 February 2016
Began operating
19 January 2017
Capacity in planning record
8 MW
Address
Stillington Industrial Estate, Stockton, village of Stillington, to the north west of Stockton and around three miles east of the A1(M, County Durham
REPD reference
4390

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.