WIND Β· OPERATIONAL

Seamer

Seamer is a 10.3 MW onshore wind farm in North East England, operated by Venitent Energy Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North East
  • England
Project stageOperating
  1. PlanningMar 2009 (completed)
  2. ConsentedSep 2009 (completed)
  3. ConstructionOct 2011 (completed)
  4. OperatingNov 2012 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
10.3 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Venitent Energy Services
Region
North East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
TS15 9JH
Coordinates
54.4942, -1.2585

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Seamer compares

319th of 488largest wind farms in the UK register
16th of 41in North East
0.03%of listed UK wind farms capacity
β‰ˆ 23 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 10.3 MW station would generate roughly 23 GWh of electricity in a year, similar to the annual use of about 8,650 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North East All run by Venitent Energy Services

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Seamer Wind Farm - Hambleton
Developer / operator
Infinis, previously Broadview Energy
Planning authority
Stockton-on-Tees
Planning reference
09/00859/FUL
Application submitted
27 March 2009
Permission granted
18 September 2009
Construction started
1 October 2011
Began operating
1 November 2012
Capacity in planning record
4 MW
Address
Land Adjacent Hilton Road, Seamer, Middlesbrough, Cleveland
REPD reference
3791

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.