BIOMASS Β· OPERATIONAL

Wilton 10 Biomass

Wilton 10 Biomass is a 33.3 MW biomass power station in North East England, operated by Sembcorp Utilities. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Bioenergy
  • North East
  • England
  • Combined heat and power
Project stageOperating
  1. PlanningSep 2006 (completed)
  2. ConsentedNov 2006 (completed)
  3. ConstructionNov 2006 (completed)
  4. OperatingMar 2007 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
33.3 MW
Status
Operational
Technology
Bioenergy
Operator
Sembcorp Utilities
Region
North East
Country
England
Grid connection (DUKES)
HV
Combined heat & power
Yes
Postcode
TS90 8WS
Coordinates
54.5756, -1.1269

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wilton 10 Biomass compares

10th of 13largest biomass stations in the UK register
2nd of 2in North East
0.56%of listed UK biomass capacity

Biomass power stations burn organic material such as wood pellets, energy crops or agricultural residues to raise steam for a turbine.

All biomass power stations Power stations in North East

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Wilton International
Developer / operator
UK Wood Recycling
Planning authority
Redcar and Cleveland
Planning reference
R/2006/0910/FFM
Application submitted
6 September 2006
Permission granted
7 November 2006
Construction started
8 November 2006
Began operating
26 March 2007
Capacity in planning record
35.2 MW
Address
Wilton International, PO Box 1985, Wilton, Middlesbrough, Cleveland, Cleveland, TS90 8WS
REPD reference
35

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.