Woodhouse PV
Woodhouse PV is a 4.88 MW solar farm in North East England, operated by European Energy A/S. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- North East
- England
Key facts
- Installed capacity
- 4.88 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- European Energy A/S
- Region
- North East
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SR5 3NS
- Coordinates
- 54.5350, -1.0758
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Woodhouse PV compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.88 MW station would generate roughly 4.3 GWh of electricity in a year, similar to the annual use of about 1,580 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in North East All run by European Energy A/SNearby generating sites
- Guisborough Β· 5 MW solar farm0.5 km
- Wilton International Β· 120 MW gas-fired power station2.2 km
- Wilton 11 Β· 49 MW energy-from-waste plant4.7 km
- Wilton 10 Biomass Β· 33.3 MW biomass power station5.6 km
- Viking Β· 50 MW open-cycle gas power station10.6 km
- Teesside Β· 62 MW offshore wind farm12.3 km
- Seamer Β· 10.3 MW onshore wind farm12.6 km
- Lambs Hill Wind Farm Β· 8 MW onshore wind farm16.2 km
Also operated by European Energy A/S
European Energy A/S operates 10 sites in the register. Largest first:
- Bubney Β· solar farm40.4 MW
- Canewdon CIC Β· solar farm4.99 MW
- Canewdon PV Β· solar farm4.99 MW
- PV@Pendine Solar Farm Β· solar farm4.9 MW
- West End Farm PV CIC Β· solar farm4.88 MW
- High Leas PV Β· solar farm4.88 MW
- West End Farm PV Β· solar farm4.88 MW
- Pendine Wind Farm Limited Β· onshore wind farm4.8 MW
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land at Woodhouse Farm
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Redcar and Cleveland
- Planning reference
- R/2015/0328/FFM
- Application submitted
- 21 May 2015
- Permission granted
- 24 November 2015
- Construction started
- 20 January 2016
- Began operating
- 24 March 2016
- Capacity in planning record
- 5 MW
- Address
- Land at Woodhouse Farm, Middlesbrough Road, Guisborough, Cleveland, TS14 6QU
- REPD reference
- 5309
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.