SOLAR Β· OPERATIONAL

Woodhouse PV

Woodhouse PV is a 4.88 MW solar farm in North East England, operated by European Energy A/S. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • North East
  • England
Project stageOperating
  1. PlanningMay 2015 (completed)
  2. ConsentedNov 2015 (completed)
  3. ConstructionJan 2016 (completed)
  4. OperatingMar 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.88 MW
Status
Operational
Technology
Solar Β· PV
Operator
European Energy A/S
Region
North East
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SR5 3NS
Coordinates
54.5350, -1.0758

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Woodhouse PV compares

444th of 662largest solar farms in the UK register
9th of 10in North East
0.09%of listed UK solar farms capacity
β‰ˆ 4.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.88 MW station would generate roughly 4.3 GWh of electricity in a year, similar to the annual use of about 1,580 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in North East All run by European Energy A/S

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Land at Woodhouse Farm
Developer / operator
Lightsource Renewable Energy
Planning authority
Redcar and Cleveland
Planning reference
R/2015/0328/FFM
Application submitted
21 May 2015
Permission granted
24 November 2015
Construction started
20 January 2016
Began operating
24 March 2016
Capacity in planning record
5 MW
Address
Land at Woodhouse Farm, Middlesbrough Road, Guisborough, Cleveland, TS14 6QU
REPD reference
5309

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026