πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content
SOLAR Β· OPERATIONAL

Bubney

Bubney is a 40.4 MW solar farm in East Midlands England, operated by European Energy A/S. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England

Key facts

Installed capacity
40.4 MW
Status
Operational
Technology
Solar Β· PV
Operator
European Energy A/S
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SY13 4QH
Coordinates
52.9760, -2.7260

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Bubney compares

21st of 662largest solar farms in the UK register
4th of 95in East Midlands
0.71%of listed UK solar farms capacity
β‰ˆ 35 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 40.4 MW station would generate roughly 35 GWh of electricity in a year, similar to the annual use of about 13,090 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by European Energy A/S

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Bubney Farm
Developer / operator
AlphaReal
Planning authority
Shropshire
Planning reference
21/01661/FUL
Application submitted
1 April 2021
Permission granted
1 October 2021
Construction started
1 September 2022
Began operating
28 March 2023
Capacity in planning record
40 MW
Address
Bubney Farm, Grindley Brook, Whitchurch, Shropshire, SY13 4QH
REPD reference
8146

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.