Dairy House Farm
Dairy House Farm is a 3.37 MW solar farm in North West England, operated by Octopus Investments. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- North West
- England
Key facts
- Installed capacity
- 3.37 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Octopus Investments
- Region
- North West
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- CW5 6DN
- Coordinates
- 53.1042, -2.5118
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Dairy House Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.37 MW station would generate roughly 3.0 GWh of electricity in a year, similar to the annual use of about 1,090 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in North West All run by Octopus InvestmentsNearby generating sites
- Safeguard Bradwall Β· 5 MW solar farm12.3 km
- Combermere Β· 14 MW solar farm13.4 km
- Fields Farm (Agden) Β· 5 MW solar farm19.1 km
- Bubney Β· 40.4 MW solar farm20.2 km
- Hadley Farm Β· 5 MW solar farm21.3 km
- Rocksavage Power Company Ltd Β· 810 MW CCGT gas power station25.1 km
- Frodsham Wind Farm Β· 50.4 MW onshore wind farm26.4 km
- Runcorn Energy from Waste Β· 91 MW energy-from-waste plant29.4 km
Also operated by Octopus Investments
Octopus Investments operates 134 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land To The North Of Dairy House Farm
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Cheshire East
- Planning reference
- 15/2779N
- Application submitted
- 19 June 2015
- Permission granted
- 30 September 2015
- Construction started
- 5 January 2016
- Began operating
- 27 February 2016
- Capacity in planning record
- 3.4 MW
- Address
- Ld To The N Of Dairy House Far, Main Road, Worleston, Nantwich, Cheshire, Cheshire, CW5 6DN
- REPD reference
- 5406
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.