Frodsham Wind Farm

Frodsham Wind Farm is a 50.4 MW onshore wind farm in North West England, operated by Foresight Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • North West
  • England
Project stageOperating
  1. PlanningFeb 2010 (completed)
  2. ConsentedOct 2012 (completed)
  3. ConstructionAug 2015 (completed)
  4. OperatingNov 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
50.4 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
Foresight Group
Region
North West
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CH2 4LB
Coordinates
53.2830, -2.7719

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Frodsham Wind Farm compares

105th of 488largest wind farms in the UK register
11th of 32in North West
0.17%of listed UK wind farms capacity
β‰ˆ 115 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 50.4 MW station would generate roughly 115 GWh of electricity in a year, similar to the annual use of about 42,470 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in North West All run by Foresight Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Frodsham Marsh
Developer / operator
Foresight/Belltown
Planning authority
Cheshire West and Chester
Application submitted
25 February 2010
Permission granted
19 October 2012
Construction started
6 August 2015
Began operating
15 November 2016
Capacity in planning record
50.4 MW
Address
Land between Manchester Ship Canal and M56, Cheshire
REPD reference
3694

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.