Shotwick

Shotwick is a 72.2 MW solar farm in Wales, operated by Foresight Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • Wales

Key facts

Installed capacity
72.2 MW
Status
Operational
Technology
Solar Β· PV
Operator
Foresight Group
Region
Wales
Country
Wales
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CH5 2UA
Coordinates
53.2321, -3.0069

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Shotwick compares

2nd of 662largest solar farms in the UK register
1st of 75in Wales
1.3%of listed UK solar farms capacity
β‰ˆ 63 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 72.2 MW station would generate roughly 63 GWh of electricity in a year, similar to the annual use of about 23,430 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in Wales All run by Foresight Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Shotwick Solar Farm
Developer / operator
Foresight Solar Fund
Planning authority
Flintshire
Planning reference
51772
Application submitted
21 February 2014
Permission granted
1 June 2015
Construction started
15 November 2015
Began operating
31 March 2016
Capacity in planning record
72.2 MW
Address
Weighbridge Road, Sealand, Deeside, Clwyd,, Flintshire, CH5 2NN
REPD reference
2347

Full project profile β†’

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.