Acrefair
Acrefair is a 5 MW solar farm in Wales, operated by Lightsource BP. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 5 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Lightsource BP
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- LL14 1TU
- Coordinates
- 52.9880, -3.0707
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Acrefair compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 5 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by Lightsource BPNearby generating sites
- Ebnal Lodge Β· 4.99 MW solar farm10.5 km
- Trench Farm Β· 5 MW solar farm11.3 km
- Fields Farm (Agden) Β· 5 MW solar farm22.8 km
- Bubney Β· 40.4 MW solar farm23.1 km
- Hadley Farm Β· 5 MW solar farm23.4 km
- Connahs Quay Β· 1,380 MW gas-fired power station24.4 km
- Charity Farm - CfD Β· 14.4 MW solar farm25.2 km
- Moor Farm Β· 3.73 MW solar farm25.9 km
Also operated by Lightsource BP
Lightsource BP operates 129 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land Opposite Tyn Y Pistyll
- Developer / operator
- Lightsource Renewable Energy
- Planning authority
- Wrexham
- Planning reference
- P/2015/0092
- Application submitted
- 10 February 2015
- Permission granted
- 12 May 2015
- Construction started
- 16 October 2015
- Began operating
- 22 December 2015
- Capacity in planning record
- 5 MW
- Address
- Land Opposite Tyn Y Pistyll, West of Delph Road, Penycae, Wrexham, Clwyd, Clwyd, LL14 1TU
- REPD reference
- 5026
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.