Moor Farm
Moor Farm is a 3.73 MW solar farm in West Midlands England, operated by WPO UK Services. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- West Midlands
- England
Key facts
- Installed capacity
- 3.73 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- WPO UK Services
- Region
- West Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Coordinates
- 52.7941, -2.8560
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Moor Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 3.73 MW station would generate roughly 3.3 GWh of electricity in a year, similar to the annual use of about 1,210 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in West Midlands All run by WPO UK ServicesNearby generating sites
- Charity Farm - CfD Β· 14.4 MW solar farm4.6 km
- Sundorne Grove Β· 18.2 MW solar farm12.4 km
- Ebnal Lodge Β· 4.99 MW solar farm15.9 km
- Trench Farm Β· 5 MW solar farm17.3 km
- Hadley Farm Β· 5 MW solar farm20.6 km
- Pitchford Β· 21 MW solar farm21.3 km
- Wrockwardine Β· 10.5 MW solar farm21.4 km
- Bubney Β· 40.4 MW solar farm22.0 km
Also operated by WPO UK Services
WPO UK Services operates 38 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Land To The North Of Moor Farm
- Developer / operator
- Navitas Project
- Planning authority
- Shropshire
- Planning reference
- 15/01805/FUL
- Application submitted
- 14 May 2015
- Permission granted
- 6 January 2016
- Construction started
- 1 June 2016
- Began operating
- 11 March 2017
- Capacity in planning record
- 3.8 MW
- Address
- Land To The North Of Moor Farm, Ruyton Road, Baschurch, Shrewsbury, Shropshire, SY4 2
- REPD reference
- 5340
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.