SOLAR Β· OPERATIONAL

High Leas PV

High Leas PV is a 4.88 MW solar farm in East Midlands England, operated by European Energy A/S. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England
Project stageOperating
  1. PlanningSep 2014 (completed)
  2. ConsentedDec 2014 (completed)
  3. ConstructionOct 2015 (completed)
  4. OperatingDec 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.88 MW
Status
Operational
Technology
Solar Β· PV
Operator
European Energy A/S
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
LN11 8PJ
Coordinates
53.3199, 0.0947

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How High Leas PV compares

444th of 662largest solar farms in the UK register
61st of 95in East Midlands
0.09%of listed UK solar farms capacity
β‰ˆ 4.3 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.88 MW station would generate roughly 4.3 GWh of electricity in a year, similar to the annual use of about 1,580 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by European Energy A/S

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
High Leas
Developer / operator
European Energy Photovoltaics
Planning authority
East Lindsey
Planning reference
N/161/01563/14
Application submitted
10 September 2014
Permission granted
10 December 2014
Construction started
15 October 2015
Began operating
18 December 2015
Capacity in planning record
6.5 MW
Address
Land north of High Leas Farm, Willoughby Lane, South Reston, Louth, Lincolnshire, Lincolnshire, LN11 8PJ
REPD reference
2277

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.