PV@Pendine Solar Farm is a 4.9 MW solar farm in Wales, operated by European Energy A/S. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- Wales
Key facts
- Installed capacity
- 4.9 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- European Energy A/S
- Region
- Wales
- Country
- Wales
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- SA33 4PR
- Coordinates
- 51.7619, -4.5502
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How PV@Pendine Solar Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.9 MW station would generate roughly 4.3 GWh of electricity in a year, similar to the annual use of about 1,590 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in Wales All run by European Energy A/SNearby generating sites
- Pendine Wind Farm Limited Β· 4.8 MW onshore wind farm1.2 km
- Parc Cynog Β· 3.6 MW onshore wind farm1.5 km
- Dyffryn Brodyn Wind Farm (GB) Β· 5.4 MW onshore wind farm16.8 km
- Jordanston Solar Farm Β· 4.63 MW solar farm19.5 km
- Ffos Las Β· 5 MW solar farm21.8 km
- Oak Cottage Β· 4.87 MW solar farm22.5 km
- West Farm Β· 7.63 MW solar farm25.2 km
- Crundale Β· 43.7 MW solar farm26.2 km
Also operated by European Energy A/S
European Energy A/S operates 10 sites in the register. Largest first:
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026
Spotted an error? Tell us and we will check it against the source.