Project stageOperating
  1. PlanningOct 2014 (completed)
  2. ConsentedApr 2015 (completed)
  3. ConstructionSep 2015 (completed)
  4. OperatingNov 2015 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
4.99 MW
Status
Operational
Technology
Solar Β· PV
Operator
European Energy A/S
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
SS4 3LW
Coordinates
51.6202, 0.6974

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Canewdon PV compares

351st of 662largest solar farms in the UK register
50th of 76in East of England
0.09%of listed UK solar farms capacity
β‰ˆ 4.4 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 4.99 MW station would generate roughly 4.4 GWh of electricity in a year, similar to the annual use of about 1,620 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East of England All run by European Energy A/S

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Fambridge Road/Canewdon Road
Developer / operator
UK Solar Assets (Alcor LS-SPV)
Planning authority
Rochford
Planning reference
14/00649/FUL
Application submitted
9 October 2014
Permission granted
2 April 2015
Construction started
1 September 2015
Began operating
23 November 2015
Capacity in planning record
5 MW
Address
Land North East of Fambridge Road, Ulverston Road, Rochford, Essex, SS4 3LD
REPD reference
4718

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.