WIND Β· OPERATIONAL

Turncole Wind Farm (GB)

Turncole Wind Farm (GB) is a 17.5 MW onshore wind farm in East of England, England, operated by RES Group. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • Onshore
  • East of England
  • England
Project stageOperating
  1. PlanningJun 2011 (completed)
  2. ConsentedFeb 2014 (completed)
  3. ConstructionOct 2015 (completed)
  4. OperatingDec 2016 (current stage)
  5. Closed (not yet reached)

Planning dates from the Renewable Energy Planning Database; operating status from DUKES table 5.11.

Key facts

Installed capacity
17.5 MW
Status
Operational
Technology
Wind Β· Onshore
Operator
RES Group
Region
East of England
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
CM0 8NE
Coordinates
51.6343, 0.8667

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Turncole Wind Farm (GB) compares

245th of 488largest wind farms in the UK register
20th of 48in East of England
0.06%of listed UK wind farms capacity
β‰ˆ 40 GWhillustrative output a year

At a typical UK load factor for this technology (about 26% of the maximum possible output), a 17.5 MW station would generate roughly 40 GWh of electricity in a year, similar to the annual use of about 14,760 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Wind farms turn the kinetic energy of the wind into electricity with turbines. Output varies with wind speed. Offshore sites usually see stronger, steadier winds than onshore sites and so generate more per MW of capacity.

All UK wind farms Wind farms in East of England All run by RES Group

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Turncole Wind Farm
Developer / operator
RES/ Aviva
Planning authority
Maldon
Planning reference
10/01070/FUL
Application submitted
30 June 2011
Permission granted
14 February 2014
Construction started
31 October 2015
Began operating
22 December 2016
Capacity in planning record
17.5 MW
Address
Turncole Farm, The Marshes, Southminster, Essex, Essex, CM0 7JJ
REPD reference
4067

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.