Lincoln Farm
Lincoln Farm is a 10.7 MW solar farm in East Midlands England, operated by Anesco. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 10.7 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Anesco
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PE24 5AT
- Coordinates
- 53.1418, 0.2015
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Lincoln Farm compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 10.7 MW station would generate roughly 9.4 GWh of electricity in a year, similar to the annual use of about 3,470 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by AnescoNearby generating sites
- Bicker Fen Β· 22.6 MW solar farm0.9 km
- The Hollies Β· 8.61 MW solar farm2.3 km
- The Hollies Β· 2.6 MW onshore wind farm2.6 km
- Wrangle Β· 10.8 MW solar farm16.4 km
- Lynn Wind Farm Β· 97.2 MW offshore wind farm16.7 km
- Inner Dowsing Wind Farm Β· 97.2 MW offshore wind farm17.1 km
- Mablethorpe Β· 1.2 MW onshore wind farm19.8 km
- Lincs Β· 270 MW offshore wind farm20.3 km
Also operated by Anesco
Anesco operates 136 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Developer / operator
- juwi Renewable Energies
- Planning authority
- East Lindsey
- Planning reference
- S/020/02242/13
- Application submitted
- 7 March 2014
- Permission granted
- 20 October 2014
- Construction started
- 1 May 2016
- Began operating
- 25 March 2016
- Capacity in planning record
- 11.4 MW
- Address
- Lincoln Farm, Wainfleet Road, Irby In The Marsh, Skegness, Lincolnshire, PE24 5AT
- REPD reference
- 1826
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.