Wrangle

Wrangle is a 10.8 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).

  • PV
  • East Midlands
  • England

Key facts

Installed capacity
10.8 MW
Status
Operational
Technology
Solar Β· PV
Operator
Greencoat Capital
Region
East Midlands
Country
England
Grid connection (DUKES)
LV
Combined heat & power
No
Postcode
PE22 0PZ
Coordinates
53.0199, 0.0633

Location

Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.

How Wrangle compares

130th of 662largest solar farms in the UK register
25th of 95in East Midlands
0.19%of listed UK solar farms capacity
β‰ˆ 9.5 GWhillustrative output a year

At a typical UK load factor for this technology (about 10% of the maximum possible output), a 10.8 MW station would generate roughly 9.5 GWh of electricity in a year, similar to the annual use of about 3,500 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.

Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.

All UK solar farms Solar farms in East Midlands All run by Greencoat Capital

Planning history

From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.

Planning status
Operational
Site name in planning record
Leverton Ings
Developer / operator
Hazel Capital LLP
Planning authority
Boston
Planning reference
B/13/0306
Application submitted
14 August 2013
Permission granted
15 October 2013
Construction started
3 January 2014
Began operating
28 March 2014
Capacity in planning record
12 MW
Address
Land at Leverton Ings, Leverton, Boston, Lincolnshire, Lincolnshire
REPD reference
1494

Source

Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β€” operational at end of May 2025. Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.
View the original source
Last checked by Octary: 15 July 2026

Spotted an error? Tell us and we will check it against the source.