Wrangle
Wrangle is a 10.8 MW solar farm in East Midlands England, operated by Greencoat Capital. The UK government lists it as operational in its register of power stations (DUKES table 5.11, May 2025).
- PV
- East Midlands
- England
Key facts
- Installed capacity
- 10.8 MW
- Status
- Operational
- Technology
- Solar Β· PV
- Operator
- Greencoat Capital
- Region
- East Midlands
- Country
- England
- Grid connection (DUKES)
- LV
- Combined heat & power
- No
- Postcode
- PE22 0PZ
- Coordinates
- 53.0199, 0.0633
Location
Map position from the published coordinates. For small sites this can be an approximate point rather than the exact boundary. Map Β© OpenStreetMap contributors.
How Wrangle compares
At a typical UK load factor for this technology (about 10% of the maximum possible output), a 10.8 MW station would generate roughly 9.5 GWh of electricity in a year, similar to the annual use of about 3,500 homes at 2,700 kWh each. This is an illustrative estimate, not the station's metered output: real generation varies with weather, availability and grid constraints.
Solar photovoltaic (PV) sites generate electricity from sunlight. Panels produce direct current, which inverters convert to alternating current for the grid. Output follows daylight and the seasons, so annual generation is a small fraction of the maximum possible.
All UK solar farms Solar farms in East Midlands All run by Greencoat CapitalNearby generating sites
- Canopus Β· 5 MW solar farm8.0 km
- Kirton Β· 3.51 MW solar farm14.1 km
- Lincoln Farm Β· 10.7 MW solar farm16.4 km
- Bicker Fen Β· 22.6 MW solar farm16.6 km
- The Hollies Β· 2.6 MW onshore wind farm18.1 km
- The Hollies Β· 8.61 MW solar farm18.3 km
- Red House Β· 12 MW onshore wind farm20.2 km
- SPD 3 - Grange Farm Β· 9.5 MW solar farm20.3 km
Also operated by Greencoat Capital
Greencoat Capital operates 195 sites in the register. Largest first:
Planning history
From the government's Renewable Energy Planning Database (REPD), matched to this site by location, capacity and name.
- Planning status
- Operational
- Site name in planning record
- Leverton Ings
- Developer / operator
- Hazel Capital LLP
- Planning authority
- Boston
- Planning reference
- B/13/0306
- Application submitted
- 14 August 2013
- Permission granted
- 15 October 2013
- Construction started
- 3 January 2014
- Began operating
- 28 March 2014
- Capacity in planning record
- 12 MW
- Address
- Land at Leverton Ings, Leverton, Boston, Lincolnshire, Lincolnshire
- REPD reference
- 1494
Source
Department for Energy Security and Net Zero (DESNZ), Digest of UK Energy Statistics (DUKES), table 5.11: power stations in the United Kingdom β operational at end of May 2025.
Capacity is installed capacity as published, not current output. Status reflects the source date, not live operation.